代表性论文专著
Na Li, Jie Pan, Xiaoqing Xie,Operational Decision Making for A Referral Coordination Alliance - When Should Patients Be Referred and Where Should They Be Referred to? OMEGA, accepted.
Yewen Deng, Na Li,_, Nan Kong, Zhibing Jiang, Xiaoqing Xie, Optimal Di_erential Subsidy Policy Design for a Workload-Imbalanced Outpatient Care Network, OMEGA, accepted.
Na Li, Yue Zhang, De Teng , Nan Kong, Pareto Optimization of Control Agreement Mechanism for Patient Referral Coordination, OMEGA,accepted.
N. Li, D. Teng, and N. Kong (2019). “Threshold Control Policy Optimization for Real-time Reverse Referral Decision of Chinese Comprehensive Hospitals.” IEEE Transactions on Automation Science and Engineering. 2019. 16(1), 45-60.
Li Na, Kong Nan, Li Quanlin Jiang zhibin, Evaluation of Reverse Referral Partnership in a Tiered Hospital System – A Queuing based Approach, International Journal of Production Research, 2017. 55(19), pp. 5647-5663
Li, Na., Yu, X., Matta, A., Modelling and workload reallocation of call centres with multi-type customers, International Journal of Production Research,2017,55(19), pp. 5664-5680
Na Li , Shiqing Yao, George Liu , Caihua Zhuang ,Optimization of A Multi-Constant Work-In-Process Semiconductor Assembly and Test Factory Base on Performance Evaluation, Computers & Industrial Engineering, 2010. 59 (2), 314-322
Na Li, Li Zheng, Zhicong Zhang, Caihua Zhuang, An Overlapping Decomposition Method for Performance Analysis of The Two-Loop Closed Production System in Semiconductor Assembly Factory, International Journal of Computer Integrated Manufacturing 24 (9), pp. 811-820,2011.
Li, N.; Jiang, Z.; Liu, G.,Analysis of Quality-Caused Re-Entrance Electrical Test System in Semiconductor Manufacturing by Markov Method. International Journal of Production Research. 2012.50(12).3486-3497.
Na Li, Zhibin Jiang. Modeling and Optimization of A Product-Service System with Additional Service Capacity and Impatient Customers. Computers & Operations Research 2013.40(8): 1923–1937.
Li Na, ZhengLi, LiQuanlin, Performance analysis of two-loop closed production systems, Computers & Operations Research,2009,36(1),119-134.
Li Na, Mike, ZhengLi, SINGLE-STATION PERFORMANCE EVALUATION AND IMPROVEMENT IN SEMICONDUCTOR MANUFACTURING: A GRAPHICAL APPROACH, International Journal of Production Economics, 2007. 107 (2), 397-403.
Na Li, Zhibin Jiang, Analysis of Two-loop Closed Production System based on Markov Model , International Journal of Industrial and Systems Engineering, Volume 9, Number 2, October 2011 , pp. 195-212(18).
Shiqing Yao;Zhibin Jiang; Na Li;Na Geng;Xiao Liu, A decentralised multi-objective scheduling methodology for semiconductor manufacturing, International Journal of Production Research. 49( 24), 2011,7227-7252.
Shiqing Yao, Zhibin Jiang, Na Li: A branch and bound algorithm for minimizing total completion time on a single batch machine with incompatible job families and dynamic arrivals. Computers & OR 39(5): 939-951 (2012)
Shiqing Yao, Zhibin Jiang, Na Li etc, A multi-objective dynamic scheduling approach using multiple attribute decision making in semiconductor manufacturing [J]. International Journal of Production Economics, 2011, 130(1): 125-133
Zhang, Zhicong,Zheng, Li,Li, Na.Semiconductor final test scheduling with Sarsa([lambda], k) algorithm.EJOR. 2011, 215(2), 446-458
Zhicong Zhang, Li Zheng, Na Li, Kaishun Hu. Minimizing mean weighted tardiness in unrelated parallel machine scheduling with reinforcement learning. Computers & Operations Research, 2012, 39(7): 1315-1324
Li Na, Zheng Li, Li QuanLin. Modeling and Analysis of A Two-Loop Closed Production System. 40th CIRP International Manufacturing Systems Seminar. Liverpool. 2007.4.
Li Na, Zheng Li, Li QuanLin. Semiconductor system with multiple closed-loops constrains. 2007 International Conference on Modeling and Analysis of Semiconductor Manufacturing. Scottsdale, Arizona, U.S.A.2007.9. EI索引.
Li Na, Zhang Lawrence, Zhang Mike, Zheng Li, Applied Factory Physics Study on Semiconductor Assembly and Test Manufacturing, 2005 International Symposium on Semiconductor Manufacturing.
Na Li, Zhibin Jiang, Jianwei Niu, Caihua Zhuang, Approximation Method for Performance Analysis of Three-Loop Closed Systems. The 2009 IEEE international Conference on Industrial engineering and engineering Management, 1249-1252. EI索引.
Na Li, Li Zheng ,Wei Feng,Analysis of Two-loop Closed Production Systems,The Fifth Annual IEEE Conference on Automation Science and Engineering (IEEE CASE 2009),460-465. EI索引.
Feng Wei,Zheng Li, Li Na, Performance evaluation of a multi-product system with setups and dynamic scheduling policies, 2010 IEEE International Conference on Automation Science and Engineering, CASE 2010 .2010, Article number 5584177, Pages 960-965
Wei Feng, Li Zheng, Na Li ,System Properties of Multi-product Systems with Setup Times and Finite Buffers, 44th CIRP Conference on Manufacturing Systems in Madison, Wisconsin, USA.
Kangzhou Wang, Zhibin Jiang, Na Li, Optimal Production Control of a Manufacturing System with Customer Balking Behavior, the proceeding of 41st Computer and Industrial Engineering Conference, Los Angeles, USA, 2011.10, pp969-974.
Wang, K., Li, N., Jiang, Z., Queueing system with impatient customers: A review, Proceedings of 2010 IEEE International Conference on Service Operations and Logistics, and Informatics, SOLI 2010 , art. no. 5551611, pp. 82-87
李娜,江志斌,郑力,庄才华,芯片封装系统两环闭型排队网络模型性能解析研究,上海交通大学学报,2010. 44(7):1014-1018.
李娜,江志斌,郑力,李杰,芯片测试环节质量重入随机系统建模与性能分析,系统工程理论与实践, 2011. 31(8),1593-1599.EI索引,
李娜; 贾博; 江志斌; 谢梦得;考虑顾客体验的排队系统研究,工业工程与管理,2012.17(3),36-40.
李娜,郑力,半导体封装测试系统的生产能力规划,系统工程. 2006.8. 107-112
李娜,郑力, 李志忠, 胡长建,温沛涵.基于XML的表面粗糙度的Web动态显示与编辑,制造业自动化.2005.12.
赵艳丽,江志斌,李娜. 基于分层赋时着色Petri网的临床路径建模,上海交通大学学报2010 44(2):0252-0258。
李友; 江志斌; 李娜; 李程晶圆制造系统投料策略综述,工业工程与管理;2011.16.(6),108-114.
全鹏; 李娜; 江志斌; 闵亚能;基于AHP和规则的多目标晶圆制造派工方法的应用,工业工程与管理,2011.16(4).113-117.
王康周,江志斌,李娜,耿娜,服务型制造资源计划体系研究架构,工业工程与管理,2010.11,Vol.16(3), pp113-120.
林文进; 江志斌; 李娜;服务型制造理论研究综述,工业工程与管理